Senin, 10 Maret 2008

Rock climbing basics


Climbers usually work in pairs. One climber climbs with the other belaying. In lead climbing, the belayer feeds rope to the lead climber through a belay device. The leader climbs, occasionally placing protection or clipping preplaced bolted hangers, until the top is reached. The belayer is ready to "lock off" the rope in case the leader falls.



Both climber and belayer attach the rope to their climbing harness. The rope is tied into the climber's harness with a figure-of-eight loop or double bowline knot. The leader either places his own protection (Traditional climbing) or clips into permanent protection already attached to the rock (Sport climbing). In traditional climbing, the protection is removable. Usually nuts or Spring-loaded camming device (often referred to as "cams" or "friends") are set in cracks in the rock (although pitons are sometimes used). In sport climbing the protection is metal loops called bolts. Bolts are secured to the rock with either expanding masonry bolts taken from the construction industry, or by placing glue-in bolt systems. In ice climbing the protection is made-up of Ice Screws or similar devices hammered or screwed into the ice by the leader, and removed by the second climber.

The lead climber typically connects the rope to the protection with carabiners or quickdraws. If the lead climber falls, he will fall twice the length of the rope from the last protection point, plus rope stretch (typically 5% to 8% of the rope out), plus slack. If any of the gear breaks or pulls out of the rock or if the belayer fails to lock off the belay device immediately, the fall will be significantly longer. Thus if a climber is 2 meters above the last protection he will fall 2 meters to the protection, 2 meters below the protection, plus slack and rope stretch, for a total fall of over 4 meters.

If the leader falls, the belayer must arrest the rope to stop the fall. To achieve this the rope is run through a belay device attached to the belayer's harness. The belay device runs the rope through a series of sharp curves that, when operated properly, greatly increases friction and stops the rope from running. Some of the more popular types of belay devices are the ATC Belay Device, the Figure 8 and various auto-locking belay devices such as the Petzl Gri-Gri

If the route being climbed is a multi-pitch route the leader sets up a secure anchor system at the top of the pitch, also called a belay, from where he can belay as his partner climbs. As the second climber climbs, he/she removes the gear from the rock in case of traditional climbing or removes the quickdraws from the bolts in the case of sport climbing. Both climbers are now at the top of the pitch with all their equipment. Note that the second climber is protected from above while climbing, but the lead climber is not, so being the lead climber is more challenging and dangerous. After completing the climb, and with both climbers at the top of the pitch, both climbers must rappel or descend the climb in order to return to their starting point. All climbs do not necessarily require the lead climber to belay the second climber from the top. The belayer could lower the lead climber down after he/she has completed a single pitch route.

Occasionally, climbers may decide to "move together", a risky but speedy technique also called simul-climbing, in which both leader and second move at the same time without stopping to belay. The leader - approximately a rope length above the second - usually places multiple pieces of protection as he climbs so that the weight of the second climber might arrest a possible leader's fall. Should the second climber to fall, however, the leader may be pulled from his holds, with potentially dangerous results.

@ source = wikipedia.org

0 komentar:

 
Cheap Web Hosting | Top Web Hosts | Great HTML Templates from easytemplates.com.